1500 final drive rebuild??


Information and questions on GL1500 Goldwings (1988-2000)
Post Reply
User avatar
offcenter
Posts: 1034
Joined: Sat Sep 22, 2012 2:10 pm
Location: Lake Hopatcong, New Jersey
Motorcycle: 99 Gl-1500 SE
76 GL-1000
77 Honda Trail 90

1500 final drive rebuild??

Post by offcenter »



The splines on the final drive that engage the rear wheel hub are worn away to almost nothing
on my '99 GL-1500.
(because the previous owner didn't keep them properly greased)
I have another (used) final drive unit on the way.
But....
I'd like to know if anyone has ever been able to replace the splined
hub in the final drive and what's involved if they did.
(and can I even get the parts?)
It would be a shame to throw away a final drive unit that is in good
shape internally.
Anyone?


George in Jersey.
99 Goldwing GL-1500 SE
76 Goldwing Gl-1000
77 Honda CT-90 "Trail 90"
User avatar
Rambozo
Posts: 2246
Joined: Sun Apr 01, 2018 8:36 pm
Location: Disneyland
Motorcycle: 1992 GL1500 Aspencade
Ducati Monster

Re: 1500 final drive rebuild??

Post by Rambozo »

The splines are made right in the gearset, which is no longer available.
FM-USA
Posts: 3090
Joined: Wed May 18, 2011 8:40 am
Location: here, there, WHY?
Motorcycle: mc's

Re: 1500 final drive rebuild??

Post by FM-USA »

GRRR . . . throw away society (T.A.S.).
''RIGHT TO REPAIR'' is a website that's trying to change this T.A.S..


.
Limpy45
Posts: 30
Joined: Mon Jan 11, 2021 2:42 pm
Location: Grand Forks, ND 58201
Motorcycle: 80 GL1100 standard and a 99 GL1500 SE

Re: 1500 final drive rebuild??

Post by Limpy45 »

If you could find a good welder/machinest with lots of time on his hands, maybe he could weld up the splines and machine back to specs??? But it would take a lot of time and skill! Old school for sure just like some of the old blacksmiths used to do on farm/industrial machinery. Would definitely take some welding and machineing skills that are probably long gone today!
User avatar
Rambozo
Posts: 2246
Joined: Sun Apr 01, 2018 8:36 pm
Location: Disneyland
Motorcycle: 1992 GL1500 Aspencade
Ducati Monster

Re: 1500 final drive rebuild??

Post by Rambozo »

The skills and equipment are still around and being used all the time. Just not for cheap consumer products like motorcycles. No one will pay the standard hourly rate for that kind of work, when there are much cheaper options. Now if you are talking about a 6 figure bulldozer those type of repairs are done all the time. I used to work at a machine shop that did the odd job like that for collector cars. Again, not a problem when the product has a high value and there are no cheaper options.
User avatar
WingAdmin
Site Admin
Posts: 23313
Joined: Fri Oct 03, 2008 4:16 pm
Location: Strongsville, OH
Motorcycle: 2000 GL1500 SE
1982 GL1100A Aspencade (sold)
1989 PC800 (sold)
1998 XV250 Virago (sold)
2012 Suzuki Burgman 400 (wife's!)
2007 Aspen Sentry Trailer
Contact:

Re: 1500 final drive rebuild??

Post by WingAdmin »

Limpy45 wrote: Sat Mar 18, 2023 1:15 pm If you could find a good welder/machinest with lots of time on his hands, maybe he could weld up the splines and machine back to specs??? But it would take a lot of time and skill! Old school for sure just like some of the old blacksmiths used to do on farm/industrial machinery. Would definitely take some welding and machineing skills that are probably long gone today!
I don't know if I would trust a weld to do the job of a spline. Splines are typically machined, treated, hardened. You can't duplicate that with weld. The crystalline structure of the metal (which is what makes it strong) is not going to be anywhere near as consistent and strong with weld.


Post Reply